Client: GASCADE Gastransport GmbH
Date: May 2018
Location: Baltic Sea to Berlin, Germany
Transported medium: Natural gas pipeline
Pipe size: DN 1400
Total length coated: 6.4 km
Total number of pipes coated: 376 pipes
Pipe length: 17 m

The new European Gas Pipeline Link (EUGAL), expected to start flowing at the end of 2019, will receive natural gas from the planned Nord Stream 2, which is intended to strengthen the supply of natural gas to Germany and Europe. It will run from the Baltic Sea through to Mecklenburg-Western Pomerania, Brandenburg, southern Saxony and the border of Czech Republic, extending over a length of about 480 kilometres.

GASCADE which operates one of the largest natural gas infrastructures in Germany is responsible for the construction of EUGAL and its future operation. GASCADE contracted TDCI to coat 376 pipes of DN 1400, (270 of which with 3 spacers each), with customized pau wrap® coating specified by GASCADE. The pipes were coated on time and will be used for selected HDD and microtunneling installation sections of the project.

Company in charge of the project:

  • - GASCADE Gastransport GmbH

Shareholders:

  • - GASCADE Gastransport Gmbh - 50.5%
  • - Fluxys Deutschland GmbH – 16.5%
  • - Gasunie Deutschland Transport Services GmbH - 16.5%
  • - ONTRAS Gastransport GmbH – 16.5%

Pipeline Length: Approx 480 kilometres

  • - EUGAL String 1: Approx. 480 kilometres
  • - EUGAL String 2: Approx. 329 kilometres